I-75 carries eight-lanes of traffic over the Rouge River through the City of Detroit and provides access to local communities and Canada. The existing bridge deck is nearly 50 years old and in need of replacement. This will take two years due to the size of the bridge.
Facts about the Rouge River Bridge:
The project includes three interchanges:
The existing bridge deck is in poor condition. I-75 has required short-term closures to repair the deck causing significant disruption to traffic.
A new bridge costs nearly $400 million. By strategically rehabilitating the bridge over the past 40 years Michgan has saved $250 million and reduced disruption.
A new bridge costs nearly $400 million. By strategically rehabilitating the bridge over the past 40 years Michgan has saved $250 million.
Due to the size, complexity and physical constraints it will take two years to replace the deck.