Project DescriptionThis project is a complete bridge reconstruction. Both the north and southbound bridges will be removed. Two new bridges will be constructed over Goddard Road and Sexton-Kilfoil Drain. This will improve the vertical profile of Goddard Road. The Goddard Road bridge facts:
Proposed Benefits:
|
Revised ProfileWith the existing Conrail railroad spur no longer in operation, the Goddard Road Bridge can be reduced in length and height. A lower profile with improved sight distance will be provided to improve operations. |
Obsolete BridgeThe need for a big bridge over Goddard is obsolete. |
Future MaintenanceFuture maintenance costs of the existing bridge would be significant if the structure is not replaced. |